Renovation

The renovation started in December, 2017.

Not only it being a fairly old building, the complex roof shape made the waterproofing quite difficult. Also, the hotel rooms on the second floor required extra care to soundproof as much as possible.

In order to cut construction costs, some of the construction work was performed by the whole staff.

Construction ended in early July 2018 and the facility was physically ready to be open to the public.